工程建设项目实施阶段程序管理暂行规定 Ministry of Construction, Administration of Procedures During the Construction of Construction Projects Tentative Provisions

2006-05-16 15:22   我要纠错 | 打印 | 收藏 | | |

建建[1995]第494号
颁布日期:19950729  实施日期:19950729  颁布单位:建设部

  Article 1 These Provisions are formulated with a view to strengthening the administration of the construction market, regulating the procedures of construction during construction projects, and safeguarding the normal operation of the construction market in accordance with the relevant laws and regulations of the State.

  Article 2 The term “construction procedures during construction projects” used in these Provisions refers to the obligatory working procedures, including preparatory construction procedures, construction procedures and construction completion procedures for new construction, expanded construction and renovation, in the areas of civil engineering, wiring, conduit laying and equipment installation projects.

  Article 3 Unless laws and regulations stipulate otherwise, construction projects undertaken inside China, including construction projects undertaken by wholly foreign-owned companies, Sino-foreign joint ventures and Sino-foreign cooperative joint ventures shall comply with these Provisions.

  Article 4 Preparatory construction procedures shall comprise reporting the progress of construction projects, commissioning construction supervisors, inviting and submitting tenders and execution of concluded construction contracts. Construction procedures shall comprise procurement of construction permits and undertaking of actual construction. Construction completion procedures shall comprise examination and acceptance of construction projects upon completion of construction and the conducting of outstanding repair and maintenance works during a specified time period.

  Upon completion of the stage of reporting the progress of the construction project, works in the initial phase of construction shall be complete and the stage of preparatory construction shall commence. Upon obtaining a construction permit, the phase of preparatory construction shall be complete and the stage of completion of construction shall commence. The construction procedures of a construction project must be complete upon expiry of the specified time period for outstanding repairs and maintenance.

  Article 5 Following approval of the feasibility study report on a construction project or other relevant documents for preliminary examination and approval, the construction unit or its representative office shall report on the progress of the construction project, submit for examination the preliminary approved documents, including a bank's proof of credit, approved land use and other relevant documents, to the local construction administrative department-in-charge or its authorized body.

  Specific procedures involved in the reporting on the progress of a construction project shall be undertaken in accordance with the provisions of the Administration of the Reporting on the Progress of Construction Projects Procedures promulgated by the Ministry of Construction under Jian Jian [1994] Document No. 482.

  Article 6 Construction units shall have the ability to control and manage their construction projects. Should appropriate management ability be found to be lacking, the construction unit shall commission and contract a construction supervisory unit or other organisation with appropriate qualifications to manage the construction project work.

  Article 7 Apart from certain special construction items of a construction project for which open tender would be inappropriate, the undertaking of all other construction items should invite tenders. Tendering may take the form of open bidding, invitation and negotiation.

  Tenders for construction projects shall be handled in accordance with the provisions of the Administration of Tender for Construction Projects Procedures promulgated by the Ministry of Construction under Order No. 23.

  Article 8 A construction unit shall enter into a construction contract with a contractor when contracting out any construction projects. Should a main contractor wish to subcontract its contracted construction projects to other subcontractors, the main contractor shall enter into a subcontractor contract with subcontractors. The provisions of the subcontractor contract shall comply with the those of the construction contract. Should there be any discrepancies, the provisions of the construction contract shall prevail.

  A specimen contract from “Construction Contracts” (GF-91-0201) formulated by the State Administration for Industry and Commerce and the Ministry of Construction shall be the standard reference for the conclusion of any construction contracts. The provisions of the Administration of Construction Project Contracts Procedures, promulgated under Jian Jian [1993] Document No. 78, shall also be strictly implemented in this regard.

  Article 9 A construction unit shall, prior to commencing any construction work, go through the procedures for obtaining a construction permit with the construction administrative department-in-charge of the People's Government above county level, or its authorised department, in the place where the construction project is located. Where a construction permit has not been obtained, construction shall not commence.

  The procedure for obtaining and management of construction permits shall be handled in accordance with the provisions of the Administration of Construction Sites Provisions promulgated by the Ministry of Construction under Order No. 15.

  Article 10 Construction industry enterprises must have a quality certificate in order to be able to contract out construction projects, and shall only contract out construction projects within the permitted scope of business as stated in the quality certificate. Quality control of foreign enterprises contracting construction projects inside China shall be handled in accordance with the provisions of the Quality Control of Foreign Enterprises Contracting Construction Projects Inside China Tentative Rules, promulgated by the Ministry of Construction under Order No. 32.

  Construction project managers shall hold the quality certificate and shall only perform management duties that are within the permitted scope of business as stated in the quality certificate. Quality controls on project managers shall be handled in accordance with the provisions of the Administration of Quality Control of Project Managers of Construction Enterprises Rules promulgated by the Ministry of Construction under Jian Jian [1995] Document No. 1.

  Article 11 Upon delivery of architectural plans by a construction unit to a construction project contractor, the contractor shall organise the earnest study of the plans by the relevant personnel. Within one month following the delivery of the architectural plans, the construction unit shall take the lead in organising the architectural design, and participating contractors shall disclose their technological means and methods for accomplishing their projects. Minutes shall be taken for meetings convened for such purposes.

  Article 12 To ensure construction quality, site safety and a civilized way of undertaking construction, construction enterprises shall strictly comply with the provisions of relevant laws and regulations and construction technological standards, write up working procedures, and formulate measures to safeguard quality, safety, and a scientific and civilized way of undertaking construction.

  Article 13 Construction enterprises shall execute construction projects strictly in accordance with the approved architectural plans and construction contract, and the current State standards on examination and acceptance of construction projects. Should changes have to be made to an architectural plan during construction, [the construction enterprise] shall comply with the relevant regulations and procedures in so doing, and no revision shall be made without authorisation.

  Article 14 Units conducting construction, supervision and management, exploration and architectural design, and units in charge of the production and supply construction materials, spare parts and accessories, and equipment, shall bear responsibility for construction quality in accordance with the Administration of Construction Quality Rules promulgated by the Ministry of Construction under Order No. 29.

  Article 15 Construction enterprises shall strengthen site management in accordance with the provisions of the Administration of Construction Sites Regulations promulgated by the Ministry of Construction under Order No. 15.

  Article 16 Where any worker or staff member is injured or killed during contracted construction work, the construction enterprise shall earnestly report the matter, investigate and handle the case in accordance with the provisions of the Reporting and Handling Accidents Which Cause Death to and Injuries of Enterprise Workers Regulations promulgated by the State Council under Order No. 75 and the Reporting and Investigating Serious Construction Accidents Working Regulations promulgated by the Ministry of Construction under Order No. 3.

  Article 17 Construction quality monitoring organisations shall earnestly perform their duties and strengthen monitoring of construction quality in accordance with the provisions of the Administration of Monitoring Construction Quality Regulations promulgated by the Ministry of Construction under (90) Jian Jian Document No. 151.

  Construction safety supervisory organisations shall strengthen the supervision of construction safety in accordance with the provisions of the Administration of the Supervision of Construction Safety Regulations promulgated by the Ministry of Construction under Order No. 13.

  Article 18 Upon completion of construction, the construction project must promptly undergo examination prior to acceptance, and go through procedures to turn over the fixed assets related thereto, in accordance with the provisions of the Examination and Acceptance of Construction Projects Rules promulgated by the State Planning Commission under Jian She [1990] Document No. 1215.

  After a construction project is examined and found to be in satisfactory condition, construction units shall promptly settle their accounts with the construction enterprises in respect of the construction project, and shall not for whatever reason leave unpaid any outstanding sum incurred from the construction project.

  Article 19 The specified time period for outstanding repair and maintenance work shall refer to the period from the date of utilisation following the turn over [of the fixed assets] and examination and acceptance of the construction project up to one year after the above date, during which [a construction unit] shall be held liable for repair, maintenance and compensation for any discovered quality deficiencies.

  Unless special circumstances so necessitate or the contract otherwise stipulates, matters related to repair and maintenance during a specified time period, touch up work, damages and compensation shall be handled in accordance with the Administration of Construction Quality Provisions promulgated by the Ministry of Construction under Order No. 29.

  Article 20 Where the provisions on the administration of construction procedures of construction projects are violated, the party held liable shall be penalized in accordance with the provisions of the relevant laws, rules and regulations.

  Article 21 Construction administrative departments-in-charge of the People's Governments of provinces, autonomous regions, and directly-governed municipalities, and the relevant ministries of the State Council shall, in the light of the actual circumstances and in accordance with these Provisions, formulate implementing rules or detailed implementing rules, and submit these to the Ministry of Construction for the record.

  Article 22 These Provisions shall become effective as of the date of promulgation.

相关资讯:
网站导航:
 四六级 指南 动态 经验 试题 资料  托福 指南 动态 经验 留学 备考
 雅思 指南 动态 机经 经验 辅导  公共英语 指南 动态 备考 试题 辅导
 日语 就业 辅导 留学 考试 报考  法语 资料 文化 考试 留学 辅导
 韩语 入门 口语 阅读 留学 文化  西语 辅导 资料 考试 留学 风采
基础法律英语
350元/门
系统讲解知识,全面提升水平
课时数:18课时左右
学员 tueiwi:
自我感觉LEC考得不错,感谢外语教育网的法律英语课程老师。
学员 tyjf:
外语教育网的法律英语信息不错,希望有朝一日可以成为法律达人,顶起!
学员 Alice12345:
我报的是法律英语的辅导班。因为英语底子不太好,一直没有太大的进步。后来,我在外语教育网报名参加了网上培训。感觉老师很负责。课程内容也详细。在老师的帮助下,感觉我的法律英语的水平得到了长足的提高。很感谢法律英语的老师的教导。谢谢老师!
学员 lionm:
一直在学法律英语,但总是找不到门路。不但单词多,而且本来认识的单词意思又变了,头痛死了。听了李文沛老师的法律英语课程后,我觉得好多了。希望能网校的法律英语课程能继续开个中级班。
学员 xyz521:
我一直在找法律英语的课程都没找到,偶然的机会来到外语教育网,发现这里的法律英语的课程真的很不错、信息也很齐全,绝对支持哦!
学员 futami:
以前自己看书,感觉非常吃力,很多地方看不懂。抱着试试看的心理,我报名参加了外语教育网的基础法律英语辅导。沙老师和李老师讲得非常好,重点、难点,经过老师的系统讲解,我都基本掌握了。就连冥思苦想都不能解决的难题,也通过答疑板请教老师而得到了满意的答复。在此衷心感谢网校的老师。
学员 hnigni:
我是法律专业的本科生,因为工作的需要,必须得会法律英语,可之前在学校的时候没好好学过啊。正头疼,同事推荐了外语教育网,于是我就报了名,开始学习。在学习过程中,发现沙老师的课真的很不错,她不但英语口语发音标准,而且她授课的内容通俗易懂,很方便我们接受和学习。另外,外语教育网的教学模式很适合我这种已经参加了工作的人,可以让我兼顾工作和学习,也很不错。特此,到网上来赞一下沙老师!沙老师,谢谢您!也谢谢网校的良好服务!在外语教育网学习,真值!
版权声明
   1、凡本网注明 “来源:外语教育网”的所有作品,版权均属外语教育网所有,未经本网授权不得转载、链接、转贴或以其他方式使用;已经本网授权的,应在授权范围内使用,且必须注明“来源:外语教育网”。违反上述声明者,本网将追究其法律责任。
  2、本网部分资料为网上搜集转载,均尽力标明作者和出处。对于本网刊载作品涉及版权等问题的,请作者与本网站联系,本网站核实确认后会尽快予以处理。
  本网转载之作品,并不意味着认同该作品的观点或真实性。如其他媒体、网站或个人转载使用,请与著作权人联系,并自负法律责任。
  3、本网站欢迎积极投稿
  4、联系方式:
编辑信箱:for68@chinaacc.com
电话:010-82319999-2371