  In many parts of the U.S. and the world, the engineering staff must keep the property heated for a good part of the year. In the winter, this means simply maintaining a comfortable, even temperature. During spring and fall,however, it is desirable to take off the chill without overheating the building - no small task if the heat is manually controlled.

  Hot water heating systems are still used in some properties, but steam systems are more common. While many properties purchase their steam from public utilities, others operate their own boilers. Coal-stoked boilers are dirty. Gas or oil burners are clean, but they require additional employees. Buying steam reduces the number of employees needed to maintain the boilers. So the engineering crew must have the technical knowledge and skill to handle them.

  Maintaining a heating plant may appear to be simple routine work, but,in reality, it requires highly technical knowledge. Burners must be maintained and repaired, thermostats must be kept in good working order, radiators and valves need attention. New types of controls are being developed that will bring heating closer to an automatic operation, but the automated repair and maintenance engineer just does not exist and probably never will.

  Another responsibility of the engineering division is the ventilation and air conditioning system. Regular changes of air are required, and it takes machinery to provide this. The public today demands air conditioning in all first-class properties. A central system provides a central point for maintenance and repair.

  Computer and other electronic devices called energy management system (EMS)

  have been developed to control peak power demand; regulate the heating,ventilating, and air conditioning throughout the building as needed; and control every aspect of energy usage in the operation .

  These systems are all technically very complex and require a knowledgeable and experienced staff to operate and maintain underscores the need for better training and education of the engineering staff.

  Useful Expressions

  take off 拿走,取消

  in reality 实际上,事实上

  close to 接近于,几乎

  Notes

  1. …the engineering staff must keep the property heated for a good part of the year.过去分词heated在句子中作宾语补足语,因为是人物业供暖,有被动的意思,故用过去分词。例如:

  They have made rules to keep the property cleaned.

  for a good part of the year可译为:一年的大部分时间

  good意为“颇,相当的”。例如:

  It will take me a good five hours to write such an article.写这样一篇文章足足要花五个小时。

  2. …it is desirable to take off the chill without overheating the building - no small task if the heat is manually controlled. no small task对前句中的to take off the chill…作进一步解释。意为“这可不是小任务”。No置于名词或形容词之前,意为“一点也不是,绝不是”。例如:

  He is no gentleman.他根本不是个绅士。

  She left her niece no small fortune.她留给侄女一笔庞大的遗产。

  3. coal-stoked boiler燃煤锅炉

  4. New types of controls are being developed that will bring heating closer to an automatic operation…

  此句中含有一个定语从句that will bring heating…,修饰new types of controls,由于修辞的需要,将定语从句后置,可避免头重脚轻。例如:

  New houses will be built that can be used to settle refuges.

  5. but the automated repair and maintenance engineer just does not exist and probably never will.

  and后的并列成份maintenance与前面的repair修饰的是同一个主语engineer, will后省略了谓语动词exist,由于该部分是省略形式,其副词never就放在了助动词will的前面。

  6. control peak power demand控制高峰时期的用电需求

  7. regulate the heating, ventilating, and air conditioning throughout the building as needed…。

  在必要时调节整栋建筑的供暖,通风以及空调的使用。as作连词,引导状语从句,此处省略了主语和系动词。

相关热词:其他 行业
行业英语辅导课程
李 健协和医科大学医学博士,美国国立卫生研究院博士后……详情>>
李健:医学英语网上辅导名师
高 云澳大利亚注册会计师协会会员,会计专业硕士……详情>>
高云:财会英语网上辅导名师
李文沛中国政法大学博士,师从著名法学家周忠海教授……详情>>
李文沛:法律英语网上辅导名师

  1、凡本网注明 “来源:外语教育网”的所有作品,版权均属外语教育网所有,未经本网授权不得转载、链接、转贴或以其他方式使用;已经本网授权的,应在授权范围内使用,且必须注明“来源:外语教育网”。违反上述声明者,本网将追究其法律责任。
  2、本网部分资料为网上搜集转载,均尽力标明作者和出处。对于本网刊载作品涉及版权等问题的,请作者与本网站联系,本网站核实确认后会尽快予以处理。本网转载之作品,并不意味着认同该作品的观点或真实性。如其他媒体、网站或个人转载使用,请与著作权人联系,并自负法律责任。
  3、联系方式
  编辑信箱:for68@chinaacc.com
  电话:010-82319999-2371